Seyrantepe Mixed Use Complex

  • Seyrantepe Mixed Use Complex

Location
Istanbul, Turkey

Client
Eroğlu Construction

Date
2010

Built Area
534.000 m2 (5,747,928.16 sqf)

Type
Mixed Use

Status
Concept

The design of the mixed-use complex with shopping center, office and residences, the main consideration was to keep the green hill on which the new complex will be built in memory and produce an interpretation of a artificial topography through the figure of the hill and let the high rise block like a crystal reaching to the sky. The shopping mall with its spatial qualities of a generous void will draw an outline for a new typology for the program.

  • _Seyrantepe-Mixed-Use-Complex-4
  • _Seyrantepe-Mixed-Use-Complex-5
  • _Seyrantepe-Mixed-Use-Complex-2